Author: admin

  • Liberton & District CC: A701 Road Corridor

    L&DCC have contacted the CEC Head of Service, Roads & Infrastructure to request urgent inspection and remedial action on worn-out carriageway markings along the A701 arterial corridor from Howden Hall Road, through Liberton Brae, Liberton Road, Craigmillar Park to Minto Street.

    27 Aug : An immediate response from the Council’s Road Operations Unit acknowledges this city-wide problem. A rolling road marking reinstatement programme is planned. However, severe fiscal constraints mean this will possibly be a five -year project. The early focus will be on the A90, Queensferry Road and A8 corridor. That said, Minto Street. Craigmillar Park, a section of Liberton Brae and a section of Howden Hall Road will be part of the 2026/27 capital resurfacing (and re-marking) programme.

    The Council's web page on Roads and Pavements is here:

    https://www.edinburgh.gov.uk/roads-pavements

    You can report across an array of problems here:

    https://www.edinburgh.gov.uk/report-problem-road

    Use the FixMyStreet site to report a local problem:

    https://www.fixmystreet.com/reports/Edinburgh?zoom=4&lat=55.91647&lon=-3.26114

  • First Aid resources in Grange Prestonfield

    We’ve been approached by Brity First Aid Training ( https://brity.co.uk ) to promote their work in putting together a free page showing defibrillators in and around the Grange Prestonfield area. This page also showcases local NHS and dental service providers.

    Brity ® provides comprehensive First Aid Training across the UK, in partnership with St John Ambulance and British Red Cross, on-site in the workplace and HSE-aligned.

    Here is the link to the Grange Prestonfield first aid page: https://brity.co.uk/communities/grange-prestonfield

  • Scot Gov proposals on ‘Mansion Tax’

    We're late to this party since the closing date for consultation comments was 24 August. Notwithstanding, here is a link to the Scot Gov consultation paper on the proposals to create two new High-Value Property Council Tax Bands for residential properties valued between £1m and £2m (Band I) and over £2m (Band J): https://www.gov.scot/publications/consultation-council-tax-high-value-property-bands-mansion-tax/pages/2/

    Our thanks to the Grange Association for the pointer here.

  • Weeds in the roads and pavements

    The proliferation of weeds along roads and pavements is a cause of concern for many local residents. The Council's policy on weed control is explained here: https://www.edinburgh.gov.uk/weedcontrol . All weed control is now carried out by manual or mechanical methods. It is a much slower process.

    If you should wish to take on the weed problem in your street, the Council offers some support by way of lending basic equipment and arranging uplift of bagged green waste. Contact the Council for more information at waste@edinburgh.gov.uk .

  • Responding To A Planning Application

    Here is a short, three-page, intro on how to structure a comment or objection to a planning application.

    Use the references included to achieve the right balance and focus on the points you want to get across the the Planners.

    https://1drv.ms/b/c/9538cbfc3d4cbf67/IQB68ZurQBJTTbhf60J4cU16AdqtJ6MqRJ-C5QKgwSVcJJo?e=XQlhtD

  • Transport Scotland / Network Rail to work on the ‘South Sub’

    Transport Scotland has announced they will work with Network Rail to undertake a high-level feasibility study of the proposal to reintroduce passenger services on the Edinburgh South Suburban railway, the ‘South Sub’, using tram-trains. This will be a technical study, in advance of any business case.

    Tram Trains for Edinburgh (TTfE), ending a successful first year of campaigning, welcomes this crucial first step in getting services back on the South Sub. With much of the required infrastructure already in place, TTfE believes it is a 'hugely practical project', notwithstanding the big engineering challenges of the Murrayfield and the Portobello – East Coast Main Line connections.

  • Cameron Toll Redevelopment

    1 Apr: Briefing Note from Development Team: Here is a link to the three-page summary note distributed at the Liberton & District CC meeting on 30 March:

    Liberton District CC Briefing Note on Cameron Toll 30 Mar 2026

    31 Mar: Cameron Toll Development Proposals: Liberton & District CC held a briefing event on 30 March. Representatives of the development team were there to answer questions. In the first instance, remind yourself of the redevelopment proposals here: https://camerontollmasterplan.co.uk/. Secondly, recognise that the proposals tabled, though detailed, are very much proposals, not firm or approved plans. Thirdly, as the development teams states, ‘your feedback will inform the final stage of the design’. From here, GPCC encourages you to make your own opinion known directly to the development team. Very likely, there will be too wide a span of local opinion to allow broad conclusions to be drawn, certainly at this time.

    Here are some of the talking points:

    *There will be a marked change in skyline profiles, with c. 45m building elevations (11 storeys) towards the north end of the site. Skyline changes and ‘intrusions’ are a big part of the design considerations. There could be c. 500 new homes; by way of sale, rent and affordable housing. Car parking facilities for householders will be very constrained. Expect student housing to be added to the mix. All of this means big infrastructure provision.

    *The covered mall concept will go. In good part by change in building regulations. There will be food and beverage outlets and ‘family leisure’ opportunities, perhaps along with some sports facilities. There is the idea of a ‘civic hub’ but it is thin on detail.

    *The whole idea of a 20-minute neighbourhood centre needs a vibrant retail core and a service hub of post office, health and personal service facilities, but it is too early to do anything other than picture these.

    *Related to the retail core is the very delicate issue of overall parking capacity – how much and how to manage. Capacity will be cut from current levels (driven by Council planning guidelines), but cut it too much and the retail hub is badly undermined.

    *The idea of redirecting the Braid Burn, while bringing part of it back to daylight from the culvert, is causing disquiet on several counts, notably on engineering considerations and on flood risk (with spillover impacts). This is still in the hands of the engineers.

    *This is not a pristine greenfield site. It is a brownfield site, marked as open to redevelopment. The existing retail hub is no longer commercially viable. Age and change in shopping patterns are the imminent threat to the Centre’s future. Change of use and a fundamental design re-think are crucial to the sites’ future as a locality and community hub. *Expect a planning application towards the end of 2026. If you have questions or seek more information, please get in contact with the development team by email at mailto:CameronToll@cbre.com

    28 Mar: Craigmillar Park Association (CPA): Ian Wright writes:

    The CPA had a meeting with CBRE and Cameron Toll management.

    Plans are progressing with more detailed architectural drawings being developed to give a much better idea of what the individual block being planned for the site will look like. Architects are looking at placement of the blocks to avoid shading of Lady Road etc. Block will be Retail at floor level with between 4 and 10 stories above. Lady Road residents of course are concerned about shadowing. Braid burn will be uncovered for part of it’s length creating a green corridor. Idea is to make the area outward facing compared with the inward looking site as present.

    Main points:

    *Current building is coming towards the end of it’s useful life. Maintenance is becoming an increasing issue.

    *Retail alone will not sustain the shopping centre. This plan is to revitalise the Cameron Toll site, or the alternative is a slow decline and dereliction.

    *Aim is to attract new outlets, e.g. perhaps a restaurant / bistro etc and increase variety of retail, while retaining the major Supermarket(s) as key attractions.

    *Car parking is being reviewed. They claim current usage is no more than 60% of car park places. Local concerns are displacement of cars into local streets.

    *There will be phased construction with individual blocks being built with the shopping centre open throughout.

    *Detailed plans should be ready be Mid 2026, with planning application done later in the year, with planning consent expected late 2026 or early 2027.

    *Further consultation will take place once more detailed plans are available.

    *Of note: Edinburgh is the retail crime hot spot of Scotland. One Scotmid shop in Tollcross lost £180,000 in goods in one year. Cameron Toll has at least daily events.

    27 Mar: Cameron Toll Development Proposals: What we see and hear of just now are exploratory, outline plans. A detailed planning application might be expected late 2026, early 2027. In any event, a profound change is in prospect to the retail-dominated layout we have at the moment. The current shopping centre is held to be past its useful life. The site needs a new commercial viability and that will rest on ‘mixed use’ and changes to profile, layout, densities and parking capacities. For people living close to Cameron Toll, the natural concerns are going to be change in skyline, new high-rise blocks, incidence of ‘shadowing’ and displacement activity. The ‘retail experience’ will change. There will be a change in the centre’s ambience and comfort zones. The present outline plans are too vague to argue for and against. We will continue to learn more and will keep you informed.

    25 Mar: Cameron Toll Development Proposals: On 30 March, Liberton & District Community Council is hosting an online review of the development plans, led by CBRE, representatives of the developers, from 7pm. For further detail and to request a Zoom online link, go to https://libertondcc.wordpress.com/ . You can view the outline plans at https://camerontollmasterplan.co.uk

    10 Mar: Cameron Toll Development Proposals: A second public display of the early proposals was presented recently at Cameron Toll centre. We expect this ‘Mixed Use’ project to move towards the planning application stage. We also expect wide publicity and public consultation to build. You can view the current Consultation Boards here: https://camerontollmasterplan.co.uk/downloads/

    Please take advantage of the invitation to give your opinion on what is proposed.

    This is a major neighbourhood project for the south-east of Edinburgh. The change envisaged reflects the change of an expanding city, prospective new transport networks, shifts in retail patterns, commercial realities and the framework of Edinburgh’s Local Development Plan, with its emphasis on neighbourhood amenity. Change happens.

    GPCC is in contact with the developer’s representatives, will be following this story, and will keep you appraised. In the meantime, make a point of responding to the feedback invitation in the link above. See also: https://www.edinburghnews.scotsman.com/news/redevelopment-of-edinburghs-cameron-toll-to-create-genuine-20-minute-neighbourhood-5618865

    12 Feb: Cameron Toll Redevelopment Plan: The second consultation event offered by the developer takes place on Thursday, 26 February in the Central Mall of the shopping centre, from 2pm to 7pm. The outline proposals from the first December event are here: https://camerontollmasterplan.co.uk/wp-content/uploads/2025/12/250004-Public-Consultation-Exhibition-Boards-final_hq.pdf . The redevelopment initiative will now have to incorporate the idea of a tram-train hub merging the proposed north-south tram with the west-east South Suburban rail line. Grand schemes!

    9 Jan 2026: Cameron Toll Redevelopment: Proposal of Application

    CBRE have revised the next exhibition date at Cameron Toll Shopping Centre from 5 February to 26 February 2026 (2pm to 7pm). This is to allow the project team to progress current discussions with the Council Planning Team and to review the comments received to date from the public and other interested parties. It will be worthwhile to get an indication of how people see the vision, not least with regard to the idea of a tram and a train stopping at the local station.

    17 Dec: Cameron Toll Redevelopment – Outline Proposals

    A Proposal of Application Notice has been submitted by Hunter REIM, carrying new outline proposals for the regeneration of the forty-year-old Cameron Toll centre. A first consultation event took place at the centre on 15 December. Another will follow on 5 February (2pm to 7pm).

    This link will take you to the ‘storyboard’: https://camerontollmasterplan.co.uk/

    The broad idea is to move the centre’s focus from mainly retail to a much wider ‘mixed village’ concept with retail, catering, entertainment, a wide range of accommodation types, and a strong community focus. The broad idea, then is squeezing the ‘quart into the pint pot’, with a ‘bit of everything. This is all very exploratory, and aspirational. The look and tone of the ‘centre’ would be very different.

    You have to invest the time to form your own views on this. We’ll follow the story as best we can.

    24 Nov: Cameron Toll Redevelopment

    News is emerging of the revised major redevelopment scheme intended for the Cameron Toll Centre. No detail as yet. The broad scheme is ‘comprehensive’: Mixed use development potentially comprising retail, commercial, residential, student accommodation, later living accommodation, hotel, office space, sports/leisure and community uses and public realm, along with associated landscaping and infrastructure.

    See also: https://theedinburghreporter.co.uk/2025/11/cameron-toll-to-be-made-tram-ready/

    The proposals will be exhibited at two consultation events as follows:

    Event 1: 2pm – 7pm, Monday 15th December 2025 Event 2: 2pm-7pm, Thursday 5th February 2026, both at Central Mall, Cameron Toll Shopping Centre, 6 Lady Rd, Edinburgh, EH16 5PB

  • Police Scotland advice on ‘cold callers’

    Timely guidance about bogus callers and doorstep crime. "Commission home or garden work from known companies. Use the Edinburgh Trusted Trader Scheme; check here: https://www.trustedtrader.scot/Edinburgh/ (or 0333 444 7016).

    Door-to-door selling: Ask to see their official 'peddlers licence'. Be very aware of personable plausible impersonators of utility company staff and the like.

    With unexpected callers, check first through a window or door viewer to establish who it is. If you open the door, keep it on a door chain or door guard if you can while you establish who it is. Keep the person outside your house. Check identity cards carefully. Establish the organisation / company exists. Don't use the phone number on the identity card; it may be fake.

    Keep your household doors locked as standard practice."

    For further information, visit https://www.scotland.police.uk/advice/scams-and-frauds

    You can contact the local crime prevention team via edinburghpreventandintervent@scotland.police.uk

  • CEC launches its Getting Around Town Toolkit

    "As the city reaches its busiest time of year, we have launched our ‘Getting Around Town’ campaign. The aim of the campaign is to raise awareness that we have an integrated public transport network in Edinburgh and to encourage people to plan their journeys, particularly as there are diversions in town and because the tram is not running to Leith and Newhaven following the fire on Princes Street.

    We have created a toolkit which you may find useful for sharing information to people in your local community. It contains key messages, social media assets and printable posters. Getting Around Town Toolkit – Google Drive

    There are public transport options for people to get wherever they need to go in town. Our website has all the information people need to plan their journeys including links to journey planning tools www.edinburgh.gov.uk/planyourjourney "

    Well done, CEC!

  • Scottish Power Energy Networks (SPEN) Cable Project

    A major programme to install medium voltage cables (33kV) through the south east of the city is now underway. Originating from Newbattle Terrace, work is scheduled to start, on Monday, 10 August, along Blackford Road (15 days) and Grange Road (16 days), Monday to Friday, 8am to 5pm. The programme will continue with phased road closures in Palmerston Road, Chalmers Crescent, Mansionhouse Road, Lauder Road, Cumin Place, Tantallon Place, Seton Place, St Catherine's Place and Findhorn Place. with work expected to be completed by 16th of September. There will be associated temporary waiting restrictions.

    Final completion is scheduled for 16 September. The programme thereafter continues through to King's Buildings and beyond to the Bio-Quarter. The contractor, Excalon, has a named Community Liaison Officer, Linda Smith. Her contact number is 07387 056652.